Roadmap to Operational Readiness

This document has been prepared by WANO (World Association of Nuclear Operators) to provide guidance on the preparation for safe nuclear plant operation to the country, company, operating entity or a new facility that is newcomer to the nuclear industry. While this document is intended to serve all new nuclear power plant construction projects, attention has also been paid to the assumptions for the project companies that have little or no nuclear experience or knowledge.

The roadmap has been developed based on industry experience with the development of new large-scale nuclear generators of various types. This report has been prepared to serve all large-scale reactor design types including boiling water reactors (BWRs), pressurized water reactors (PWRs), high-temperature and gas-cooled reactors (HTGRs) and pressurized heavy water reactors (PHWRs).

To access the document please visit:

https://www.wano.info/getmedia/37b5901b-7bd9-4cee-9e49-32800da54703/R2OR-Revision-1-(19-January-2023-Blue-Cover)__1.pdf.aspx